51N4E, Brussels · 2021 to 2025
Territories in Transition
Territories in Transition grew out of Luxembourg in Transition. The commissions it took on shared a condition. A territory's core environmental questions sat across several authorities, and each could act on its own part alone. I built the service to answer that condition, with an external reading of the whole territory, an agenda that ministries, metropolitan authorities and municipalities could subscribe to, and the evidence, fieldwork and public material to carry it.
I owned its business development, consortia, budgets and delivery, built a team of up to twelve, and ran regular sessions on systems thinking, simulation and client communication whose methods were taken up across the practice. It secured €2.2m in consultancy fees over two years, in five countries, and continued after I left. Between 2017 and 2025 I led more than fifty bids at 51N4E and won close to half of them.
Luxembourg · 2020 to 2022
Instrument adopted
Led 51N4E's contribution to the national consultation for the Ministry of Energy and Spatial Planning, wrote its chapters on land take and diet shift, and designed the transferable development rights instrument the minister adopted.
With 2001, LOLA and scientific, environmental and mobility specialists. Read the case
Agglocentre, Luxembourg · 2022 to 2023
Pilots handed over
The Ecosystemic Belt and Vital Belt
Framed and led 51N4E's work on a greenbelt for Luxembourg's central agglomeration, read through its ecosystem services, and secured the Vital Belt extension of four field sessions, twenty interviews, four films and a public map. I curated its exhibition in 2023.
With 2001, LOLA and specialist collaborators, for the Ministry of Energy and Spatial Planning.
Agglocentre to Region Sud · 2023
Seven areas named
Interurban Landscapes
Directed a resilience study between two agglomerations, commissioning species-movement modelling and reading it with mobility and land-use evidence to name seven areas for intervention.
With 2001, LOLA and specialist collaborators. The movement model was written by a specialist collaborator.
Lyon · 2022 to 2025
Follow-on commissioned
Grande Porte des Alpes
Led four climate-adaptive visions for 2,500 hectares, over a third of it facing obsolescence, proposing compaction over sealed and vacant land in place of expansion on virgin soil. The Métropole commissioned masterplans for the Parc Technologique and the golf course between Chassieu and Bron.
With 2001, LOLA and Ville Ouverte, for the Métropole de Lyon. My involvement ran to January 2025.
Sint-Stevens-Woluwe · image to select
20 ha
Zaventem · 2022
Plan in force
RUP Recy Park
Compared relocation options for Vanpachtenbeke, a recycling company whose site a regional plan had set to close to recycling by 2026, and negotiated the conditions on which it could stay. The plan now in force keeps the business on a smaller footprint, turns the green zone into a landscape park and keeps the farmland in use.
For Vanpachtenbeke, negotiated with the Municipality of Zaventem, residents and the neighbouring hospital.
Parma · 2024
Competition won
Chiesi Gardens
Led the winning competition for the regeneration of Chiesi's former industrial site, and proposed a foresight and engagement track that brought the company's departments into one brief before design. The project continues with the client and the design team.
51N4E and TEN for Chiesi Group. Image published by the project team.